EXTENSION OF A5 CONSTRUCTION SECTION 04 WILFERSDORF - WALTERSKIRCHEN  

The A5 construction section 04 project is part of the extension of the A5 North Autobahn from Schrick to Poysbrunn.
This construction section extends over 7.4 km, with 14 bridge construc-tions. A total of approx. 1.45 million m3 of excavated material is being moved, and 132,000 m2 of concrete surface and 51,600 t of mixture is be-ing integrated.

Client: Autobahnen- und Schnellstraßen-Finanzierungs-AG
Construction period: August 2015 to July 2018  