PLANAI SKI LIFT BUILDING, SCHLADMING

After demolishing the old building, Granit as the contractor completed the new Planet Planai base station with striking architecture within a year. What made the project a particular challenge for our structural engineering team was the fact that the loop feature had to be entirely barrier free.

Client: Planai Hochwurzen Bahnen GmbH
Construction period: 3/2010 - 11/2011

drucken